Know the landed cost before you order
Prices include VAT. Shipping is charged separately and calculated at checkout for your destination. If no shipping option is shown, contact us for a quote before ordering.
Available to Order
Not sure which one? Ask us to confirm fitment first →Prices include VAT. Shipping is charged separately and calculated at checkout for your destination. If no shipping option is shown, contact us for a quote before ordering.
Estimated lead time: 4–6 weeks. Delivery may be faster depending on stock levels. Contact us before ordering if timing matters.
We confirm build spec, lead time and delivery arrangements with you before any money moves. Prefer to talk it through first?
| Specification | Details |
|---|---|
| SKUs | 34102401, 34102601 |
| Applications | 2012-2020 Jeep SRT 6.4L; 2018 Trackhawk 6.2L; 2018 Durango SRT 6.4L |
| Material | 304 stainless steel |
| Primaries / outlets | 34102401: 1-7/8" / 3"; 34102601: 2" / 3" |
| Included | Gaskets and installation hardware |
| Required connections | Matching Kooks pipes, separate |
These Kooks long tube headers offer 1-7/8" or 2" primaries with 3" outlets for the Jeep SRT, Trackhawk and Durango SRT applications. You get the header upgrade with gaskets and fitting hardware, ready to match to the required Kooks front connections.
SKUs: 34102401, 34102601
Both sizes use stainless steel and the same 3" downstream connection. Match the primary choice to the engine, modifications and complete exhaust rather than buying on diameter alone.
These headers fit Jeep SRT 6.4 for 2012-2020, Trackhawk 6.2 for 2018 and Durango SRT 6.4 for 2018. Keep those years in the plan when pairing them with a connection pipe that has a wider application range.
| SKU | Configuration | Supplied arrangement | Fitting / engine conditions |
|---|---|---|---|
| 34102401 | Header Size: 1-7/8" | 1-7/8" primaries, 3" outlets; gaskets and installation hardware included. | Matching header and connection year overlap required |
| 34102601 | Header Size: 2" | 2" primaries, 3" outlets; gaskets and installation hardware included. | Matching header and connection year overlap required |
We recommend tuning with every header installation so the calibration suits your new headers, complete exhaust and fuel. Talk to us to discuss the right tuning route for your vehicle.
For a 2012-2020 Jeep SRT 6.4, or 2018 Trackhawk 6.2 / Durango SRT 6.4, the Jeep / Durango GREEN connections provide a catted OEM rear route. Use those header-backed years when ordering both parts.
| Years | Vehicle / trim | Engine | Applicable SKU | Fitting conditions |
|---|---|---|---|---|
| 2018 | Dodge Durango SRT | 6.4L V8 | 34102401, 34102601 | Matching header and connection year overlap required |
| 2012-2015 | Jeep Grand Cherokee SRT8 | 6.4L V8 | 34102401, 34102601 | Matching header and connection year overlap required |
| 2013-2020 | Jeep Grand Cherokee SRT | 6.4L V8 | 34102401, 34102601 | Matching header and connection year overlap required |
| 2018 | Jeep Grand Cherokee Trackhawk | 6.2L V8 | 34102401, 34102601 | Matching header and connection year overlap required |
34102401, 34102601: Competition, off-road and track use only. Not for use on public roads.
The competition-use waiver applies to 34102401, 34102601.
Estimated lead time is 4-6 weeks. Delivery may be faster depending on stock levels. Shipping is charged separately.
| Specification | Details |
|---|---|
| SKUs | 34102401, 34102601 |
| Applications | 2012-2020 Jeep SRT 6.4L; 2018 Trackhawk 6.2L; 2018 Durango SRT 6.4L |
| Material | 304 stainless steel |
| Primaries / outlets | 34102401: 1-7/8" / 3"; 34102601: 2" / 3" |
| Included | Gaskets and installation hardware |
| Required connections | Matching Kooks pipes, separate |
The front connections are a separate purchase; the headers include gaskets and fitting hardware.
Use the years that both parts cover. These headers fit Jeep SRT 2012-2020, or Trackhawk and Durango SRT in 2018.
Prices include VAT. Shipping is charged separately and calculated at checkout for your destination. If no shipping option is shown, contact us for a quote before ordering.
Estimated lead time: 4–6 weeks. Delivery may be faster depending on stock levels. Contact us before ordering if timing matters.
Model year, engine, drivetrain, hardware and existing modifications can all change what fits. Check the applications and supplier notes above, or send us your exact vehicle and setup before ordering.
Send us your vehicle, year, current setup and any fitting date, event, trip or deadline before ordering. We will help check fitment, product choice and timing.