Know the landed cost before you order
Prices include VAT. Shipping is charged separately and calculated at checkout for your destination. If no shipping option is shown, contact us for a quote before ordering.
Available to Order
Need help checking the dimensions or connections? →Prices include VAT. Shipping is charged separately and calculated at checkout for your destination. If no shipping option is shown, contact us for a quote before ordering.
Estimated lead time: 4–6 weeks. Delivery may be faster depending on stock levels. Contact us before ordering if timing matters.
Check the stated dimensions, connections and installation requirements before ordering. Contact us if you need help choosing the part.
| Specification | Details |
|---|---|
| SKU | 9002S |
| Material | Stainless steel |
| Thread | M18 x 1.50 |
| Design | Flat on both sides |
| Purpose | Weld-in threaded oxygen-sensor mounting point |
| Installation type | Custom exhaust fabrication |
The Kooks 9002S stainless bung gives a fabricated exhaust an M18 x 1.50 threaded mounting point for a compatible oxygen sensor. Its flat-sided design is a fabrication component to weld into the chosen pipe position, helping you plan sensor access and wiring clearance as part of the exhaust build.
SKU: 9002S
M18 x 1.50 identifies the thread diameter and pitch. Match it to the sensor, then have the fabricator choose an appropriate location and orientation for the application. Allow access for fitting and removal, with the sensor lead routed clear of heat and moving parts.
Estimated lead time is 4-6 weeks. Delivery may be faster depending on stock levels. Shipping is charged separately.
| Specification | Details |
|---|---|
| SKU | 9002S |
| Material | Stainless steel |
| Thread | M18 x 1.50 |
| Design | Flat on both sides |
| Purpose | Weld-in threaded oxygen-sensor mounting point |
| Installation type | Custom exhaust fabrication |
It is the threaded mounting bung for a compatible sensor.
No. Use an appropriate extension harness if the sensor lead needs additional reach.
M18 x 1.50. Match the actual sensor thread before fabrication.
Prices include VAT. Shipping is charged separately and calculated at checkout for your destination. If no shipping option is shown, contact us for a quote before ordering.
Estimated lead time: 4–6 weeks. Delivery may be faster depending on stock levels. Contact us before ordering if timing matters.